In order to strengthen the management of lifting machinery, lifting
machinery to ensure the normal operation and safety, the system is
formulated.gantry crane manufacturers1.
The management system is applicable to overhead cranes, gantry cranes,
crane (tower) cranes, gantry cranes, truck cranes, tire cranes, crawler
cranes, cargo lift, hoist, electric hoist. Does not apply to railway
cranes, lifting equipment underground mines, manned lifting equipment.container gantry crane2.
The business should be based on the type, number and complexity of
lifting machinery, the establishment of full-time or part-time
engineering and technical personnel responsible for the management of
mechanical lifting device power management.
3. Use the unit should
establish the necessary lifting equipment repair and maintenance,
periodic inspection, rules and regulations, safe procedures and shift
system.4. lifting equipment must be registered and established by
one device files. Files should include the original technical
information product certification, quality certificates, drawings, etc.,
as well as running records, previous technical inspection reports,
overhaul, change the original design performance and major accident
records.
5. A variety of different specifications of lifting
machinery must press GB6067-85 "crane safety regulations," the
provisions of the appropriate safety devices installed, tower cranes to
add enough weight. Various rope selection, use and disposal procedures
must also comply with the requirements.
6. lifting machinery
workplace have adequate lighting and lifting channel, and should be kept
a safe distance from the provisions of the nearby equipment, buildings,
and electrical lines.
7. lifting machinery to implement dedicated system, each person responsible for lifting machinery must use management.
8.
The operator of lifting machinery used must be "four three will
understand" (understand performance, understand the structure, to
understand the principles, understand the purpose, use, maintenance will
be, will be troubleshooting). And specialized training, after obtaining
the certificate by the department exam before being fully operational.
9.
When the newly acquired lifting machinery, manufacturing must obtain a
permit to purchase a professional manufacturer of products, safety
protection devices to be complete. And a complete certificate.
10.
When using the unit for a major transformation of lifting machinery or
alter the original design performance, must come up with based on "crane
design specifications" transformation plan, design drawings, books and
quality assurance measures calculated and the competent authorities and
by the factory director or Chief Engineer approval, the local labor
department.
11. Use the units should be regularly lifting machinery
for technical inspection and testing, periodic inspection and testing of
the content performed in GB6067085 "crane safety regulations"
requirement.
12. The new installation, after overhaul or change the
original design performance of lifting equipment must be static load
test and dynamic load testing and other technical inspection before use,
the device power management, security services and user departments to
identify common acceptance, and before use by the competent director or
chief engineer approval.