grab bridge crane control system during handling, installation, wiring, what precautions have
Digital
Intelligent crane control system JH-DSC Before installing and
commissioning the control system, be sure to familiarize themselves with
the safety precautions and in strict accordance with the requirements
of handling, installation, commissioning and maintenance.
JH-DSC handling
Please hold the JH-DSC bottom when handling, otherwise it will be dangerous shedding.
JH-DSC installation
JH-DSC damaged and missing parts of the JH-DSC, please do not install and use, to avoid lead to accidents.bridge gantry cranePlease
install on a non-combustible materials such as metal, and can withstand
the weight of the place, otherwise there will be people injured when
falling.
Please try not to JH-DSC installation of water splashing in place, it may cause a short circuit JH-DSC.
Do not JH-DSC installed in direct sunlight, otherwise it will shorten the life of JH-DSC.
Wiring must be carried out by qualified personnel, otherwise there is the risk of electric shock.
Mains are completely disconnected, and then wiring, otherwise careful of electric shock.
JH-DSC must be grounded ground terminal, otherwise the risk of electric shock.
Before power must cover the cover, otherwise it will lead to electric shock or short circuit.
Do not confuse the input and output terminals, otherwise JH-DSC explosion hazard.
Energized, do not touch the JH-DSC terminal, non-wet hands to avoid electric shock.
Please
correct the connection between the output terminals and the motor cable
U, V, W, on the contrary will affect the direction of rotation of the
motor.
overhead bridge cranes control system is the most advanced crane safety management system