2015年4月28日星期二

Electric chain hoist use? Features?

A: for low-speed material handling aspects of a small stroke, equipment installation, mining and engineering construction, cheap, safe and reliable, bring convenience to your work.

It retains the chain hoists lightweight and convenient features, and improved manual chain hoists, lifting speed and slow enough that it combines the advantages of explosion proof hoists  and chain hoists in one, using the disc brake motor powered, planetary gear decelerate, with a compact, small size, light weight, high efficiency, easy to use, reliable braking, easy maintenance features.

2015年4月25日星期六

What is the difference between chain hoist and wire rope hoist is?

A: The chain is a chain hoist, wire rope electric hoist is a rope, chain hoist the quality of my company guaranteed low prices.
CD1, MD1 type explosion proof electric hoist is a small light lifting equipment, with a compact, light weight, small size, parts versatility, easy operation.

2015年4月22日星期三

General Electric Hoist

Electric hoist is a small light lifting equipment, installed in the top of the crane, with a small size, light weight, simple operation, easy to use features for industrial and mining enterprises, storage terminals and other places. Weight is generally from 0.1 to 80 tons, lifting height of 3 to 30 meters. By the motor, transmission and rolls or sprockets, divided into wire rope hoist and electric chain hoist two. explosion proof hoists into two kinds of imported and domestic; wire rope hoist points CD1 type (single speed upgrade), MD1 type (double speed upgrade); mini electric hoist, hoist, hoist multi-functional. Starting weight: 0.25t-60tELK electric wire rope hoists crane _ _ ELK chain hoist _ _ crane lifting height: 3m-30m working level: M3 running speed: 20 (30) m / min Lifting speed: 8m / min

2015年4月19日星期日

Problem hoist rails might encounter

The vast majority of metallurgical hoist crane is installed on a handful of fixed rail. Before installing hoist rail beam must first understand the type, length, with or without seams, with or without bumper and grounded. Only rail model and implement a mechanism to be able to adjust to run the installation space. If the rail is too long and way too weld the best in the "front rail lifting" the welds polished to avoid future rail and hoists are installed after the completion of the sports car appeared blocked walking "slip" or even "bounce" that could not explosion proof hoist Road, rail joints smoothly beyond the situation. Treatment could have increased the difficulty of solving the problem on the ground have had to deal with starting the fire and aerial job ticket, fill paint corrosion occurs only cause duplicate scaffolding erection problems also added a safety hazard. Road, rail Although it is not our work, but I think we all know that "interdependent", "gates of fire adverse impacts to fish," the truth. This requires that we implement on-site technicians often run rail installation progress and keep good communication with technicians brothers rail mounted unit is responsible for the post-commissioning, acceptance of work to do preliminary groundwork. Otherwise, when the relevant technical personnel responsible for the installation of rail have been removed from this work truly become "historical issues" after dealing with them is extremely difficult.
Besides bumper. In many cases the ends of the bumper rail away from walls and other equipment or buildings too close to explosion proof electric hoist the body longer and therefore they are easily accessible in the welding bumper level best to hoist the end face of the front wheel from the car to walk the distance as bumper welding actual position basis. Often a lot of cars stand in front of the factory rail welding is completed, but the actual site conditions must prevail before lifting. To avoid the trouble to produce bumper complete transformation of the ground and do the best are embalmed. Some bumper design a buffer or cushion rubber block of wood which requires that we must be optimistic about the drawings are often not so fine for content on our own installation crew received the drawings, it is necessary to consult other departments on rail details condition. In the transfer of rail when we must implement the above, or not receive.